Arisa Prekprakhon
A race against the clock and a triumph of teamwork
When a critical Siemens component was misrouted mid-shipment, rapid coordination and decisive action ensured production deadlines were still met.
When a cruise ship was stranded with thousands onboard, rapid global sourcing and air logistics helped minimise downtime and disruption.
Rapid global sourcing and overnight logistics coordination.
Minimised operational downtime, significantly reducing passenger disruption.
Strong customer appreciation and strengthened partnership.
On 9 December 2019, I received an urgent enquiry from one of Europe's premier ferry and cruise providers, a company that has been connecting the UK and Europe for nearly two centuries. They were facing a critical emergency when a cruise ship, the Ventura, was stranded off the coast of Tenerife due to multiple component failures. More than 3,100 passengers were aboard, creating an intense high-stakes scenario.
With the ship immobilised and docked in Tenerife, rapid procurement and delivery of specialised Siemens Simadyn components; processor modules, communication modules, interface modules and power supplies became critical. These parts needed to be sourced globally, delivered overnight to Germany and then flown directly to Tenerife via a chartered aircraft.
"When 3,100 people were left stranded, our logistical capabilities were put to the test."
Sven Bretschneider
Recognising the critical nature of the situation, our extensive global supply network sprang into action. Leaning heavily on our Order Fulfilment Team, we rapidly sourced all necessary components, meticulously coordinating the logistics to consolidate deliveries from multiple international suppliers. Through intensive overnight coordination, we secured early pick-ups for each part, ensuring their timely arrival in Hamburg. The comprehensive logistical planning culminated perfectly with the parts being promptly loaded onto the chartered plane.
Our swift, decisive actions resulted in the components arriving precisely when needed, significantly reducing the ship's downtime. The Ventura’s delay was minimised to only four days, avoiding prolonged inconvenience for thousands of passengers and ensuring minimal disruption. The swift success of the project generated a great amount of appreciation: "On behalf of the entire team, we would like to personally thank you for your outstanding efforts. We are delighted to have such flexible and committed suppliers on board."
當時間緊迫時,我們的團隊隨時準備協助您採購所需零件,並確保生產順利進行。請與我們聯絡,立即開始。
Arisa Prekprakhon
When a critical Siemens component was misrouted mid-shipment, rapid coordination and decisive action ensured production deadlines were still met.
Ash Tideswell
Faced with extreme part scarcity and long lead times, this customer relied on EU Automation’s global network to secure rare components fast.