David Schron
Powering global offshore energy operations
With €950,000 at stake each day, swift after-hours action ensured a critical spare reached an offshore energy customer without delay.
A same-day sourcing and delivery solution helped restart a halted bottling line at one of Germany’s largest breweries.
Rapid turnaround from enquiry to delivery.
Significant revenue and reputation safeguarded.
Personal pride in contributing to a brand important to my family.
As a proud German, there's nothing I enjoy more than sitting down with a great German beer. You can imagine my excitement when I received an urgent enquiry directly from one of Germany’s largest breweries and was presented with the opportunity to save their production line.
I quickly learned that they were facing a serious emergency: a crucial bottling line had malfunctioned, completely halting the production of their small bottles. The situation was urgent. Without immediate action, the brewery faced extensive downtime and potentially significant revenue losses.
"I can proudly tell my father that I helped save beer production in Germany. That’s something we’ll both be raising a glass to!"
Ole Klein
Understanding the gravity of the situation and feeling a personal sense of responsibility, I immediately set about sourcing the specific part needed: a B&R 3IF797.9-1 interface module. Drawing on EU Automation's extensive global network and resources, I was able to rapidly locate and dispatch the required component within just a few hours. By the end of the same day, a courier was already delivering the critical part directly into the brewery’s hands.
Because of our quick response, the brewery was able to get their bottling line back online with minimal disruption. Production resumed smoothly, ensuring the brewery avoided substantial downtime and the associated revenue losses. Personally, I couldn't wait to call my father and proudly share how I'd helped keep our favourite beer flowing.
When time is critical, our team is ready to help you source the parts you need and keep production moving. Contact us to get started.
David Schron
With €950,000 at stake each day, swift after-hours action ensured a critical spare reached an offshore energy customer without delay.
Rob Holloway
An unprecedented same-day international delivery prevented disruption for a leading aerospace manufacturer just days before Christmas.
提交此表格即表示您同意接收來自 EU Automation 的電子郵件通訊。您可以隨時取消訂閱。請查看我們的 隱私政策
無論您需要選型建議、尋找正確零件,還是其他支持,我們的團隊都會協助您保持業務順暢運行。