Mayday at sea results in rescue by air

When a cruise ship was stranded with thousands onboard, rapid global sourcing and air logistics helped minimise downtime and disruption.

Sven Bretschneider Sven Bretschneider
Global logistics coordination for maritime emergency response

전체 영상을 시청하기

Rapid global sourcing and overnight logistics coordination.

Minimised operational downtime, significantly reducing passenger disruption.

Strong customer appreciation and strengthened partnership.

The opportunity

On 9 December 2019, I received an urgent enquiry from one of Europe's premier ferry and cruise providers, a company that has been connecting the UK and Europe for nearly two centuries. They were facing a critical emergency when a cruise ship, the Ventura, was stranded off the coast of Tenerife due to multiple component failures. More than 3,100 passengers were aboard, creating an intense high-stakes scenario.

The challenge

With the ship immobilised and docked in Tenerife, rapid procurement and delivery of specialised Siemens Simadyn components; processor modules, communication modules, interface modules and power supplies became critical. These parts needed to be sourced globally, delivered overnight to Germany and then flown directly to Tenerife via a chartered aircraft.

"When 3,100 people were left stranded, our logistical capabilities were put to the test."

Sven Bretschneider

My solution

Recognising the critical nature of the situation, our extensive global supply network sprang into action. Leaning heavily on our Order Fulfilment Team, we rapidly sourced all necessary components, meticulously coordinating the logistics to consolidate deliveries from multiple international suppliers. Through intensive overnight coordination, we secured early pick-ups for each part, ensuring their timely arrival in Hamburg. The comprehensive logistical planning culminated perfectly with the parts being promptly loaded onto the chartered plane.

A successful outcome

Our swift, decisive actions resulted in the components arriving precisely when needed, significantly reducing the ship's downtime. The Ventura’s delay was minimised to only four days, avoiding prolonged inconvenience for thousands of passengers and ensuring minimal disruption. The swift success of the project generated a great amount of appreciation: "On behalf of the entire team, we would like to personally thank you for your outstanding efforts. We are delighted to have such flexible and committed suppliers on board."

자동화 또는 제어 부품이 급히 필요하십니까?

시간이 중요한 경우, 저희 팀은 귀하가 필요로 하는 부품을 조달하고 생산이 원활하게 진행될 수 있도록 도와드릴 준비가 되어 있습니다. 시작하시려면 저희에게 연락해 주십시오.

모든 성공 사례 보기

모든 성공 사례 보기

최신 정보를 받아보십시오. 앞서 나가십시오.
뉴스레터를 구독하십시오.

양식을 제출하시면 EU Automation으로부터 이메일을 수신하는 것에 동의하는 것으로 간주됩니다. 언제든지 수신을 거부하실 수 있습니다. 보기 개인정보 처리방침

저희 팀과 대화하기

조언이 필요하거나 적합한 부품을 찾는 데 도움이 필요한 경우, 저희 팀이 고객님을 도와드리며 운영이 원활하게 진행될 수 있도록 지원해 드립니다.