Ole Klein
Saving the day at one of Germany’s largest breweries
A same-day sourcing and delivery solution helped restart a halted bottling line at one of Germany’s largest breweries.
현재 이 페이지는 영어와 제한된 수의 언어로 제공되고 있습니다.
When a cruise ship was stranded with thousands onboard, rapid global sourcing and air logistics helped minimise downtime and disruption.
Rapid global sourcing and overnight logistics coordination.
Minimised operational downtime, significantly reducing passenger disruption.
Strong customer appreciation and strengthened partnership.
On 9 December 2019, I received an urgent enquiry from one of Europe's premier ferry and cruise providers, a company that has been connecting the UK and Europe for nearly two centuries. They were facing a critical emergency when a cruise ship, the Ventura, was stranded off the coast of Tenerife due to multiple component failures. More than 3,100 passengers were aboard, creating an intense high-stakes scenario.
With the ship immobilised and docked in Tenerife, rapid procurement and delivery of specialised Siemens Simadyn components; processor modules, communication modules, interface modules and power supplies became critical. These parts needed to be sourced globally, delivered overnight to Germany and then flown directly to Tenerife via a chartered aircraft.
"When 3,100 people were left stranded, our logistical capabilities were put to the test."
Sven Bretschneider
Recognising the critical nature of the situation, our extensive global supply network sprang into action. Leaning heavily on our Order Fulfilment Team, we rapidly sourced all necessary components, meticulously coordinating the logistics to consolidate deliveries from multiple international suppliers. Through intensive overnight coordination, we secured early pick-ups for each part, ensuring their timely arrival in Hamburg. The comprehensive logistical planning culminated perfectly with the parts being promptly loaded onto the chartered plane.
Our swift, decisive actions resulted in the components arriving precisely when needed, significantly reducing the ship's downtime. The Ventura’s delay was minimised to only four days, avoiding prolonged inconvenience for thousands of passengers and ensuring minimal disruption. The swift success of the project generated a great amount of appreciation: "On behalf of the entire team, we would like to personally thank you for your outstanding efforts. We are delighted to have such flexible and committed suppliers on board."
시간이 중요한 경우, 저희 팀은 귀하가 필요로 하는 부품을 조달하고 생산이 원활하게 진행될 수 있도록 도와드릴 준비가 되어 있습니다. 시작하시려면 저희에게 연락해 주십시오.
Ole Klein
A same-day sourcing and delivery solution helped restart a halted bottling line at one of Germany’s largest breweries.
David Schron
With €950,000 at stake each day, swift after-hours action ensured a critical spare reached an offshore energy customer without delay.
양식을 제출하시면 EU Automation으로부터 이메일을 수신하는 것에 동의하는 것으로 간주됩니다. 언제든지 수신을 거부하실 수 있습니다. 보기 개인정보 처리방침
조언이 필요하거나 적합한 부품을 찾는 데 도움이 필요한 경우, 저희 팀이 고객님을 도와드리며 운영이 원활하게 진행될 수 있도록 지원해 드립니다.