Sven Bretschneider
Mayday at sea results in rescue by air
When a cruise ship was stranded with thousands onboard, rapid global sourcing and air logistics helped minimise downtime and disruption.
このページは現在、英語および一部の言語でのみご利用可能
Faced with extreme part scarcity and long lead times, this customer relied on EU Automation’s global network to secure rare components fast.
Reduced lead times dramatically from over 16 weeks.
Rapid sourcing of rare high-demand components.
Reinforced the value of nurturing global supply network relationships.
My job often involves solving challenges that others can't. Recently, one of Europe’s leading distributors of industrial maintenance products and services was desperately looking for specific Omron cameras.
These essential components typically had lead times stretching beyond 16 weeks. They had repeatedly been let down by suppliers, with promised dates continually pushed back, leaving them frustrated and facing serious delays.
These Omron cameras were extremely scarce and practically impossible to locate quickly. The customers' extensive searches had yielded no results, putting them at risk of significant delays, potential operational disruptions and escalating costs. Even my tried and tested sourcing methods came up empty-handed, forcing me to get creative.
"When the customer told me these parts were like gold dust, I was excited to prove that finding impossible components is just another day at EU Automation."
Ash Tideswell
Recognising the urgency, I immediately leveraged my network of trusted industry contacts, hunting for the parts needed and leaving no stone unturned. Through close collaboration and rapid communication, I was able to tap into previously inaccessible sources to secure the required parts and ensure we delivered the elusive cameras far quicker than the industry-standard lead time.
Thanks to EU Automation's unique resources and commitment to going above and beyond for our customers, I was able to secure and deliver these critical components to the customer where many others had failed. This success highlights the benefits of our robust and extensive supply network and our unique ability to rapidly source rare parts when others simply can't.
Our customer, one of Europe's premier MRO distributors, was immensely relieved by our success, avoiding the damaging impacts of prolonged downtime and ensuring continuity in their operations.
納期が迫っている場合でも、当社のチームがお客様が必要とする部品の手配をサポートし、生産を円滑に進められるようお手伝いいたします。まずはお気軽にお問い合わせください。
Sven Bretschneider
When a cruise ship was stranded with thousands onboard, rapid global sourcing and air logistics helped minimise downtime and disruption.
Ayu Sayekti
After a factory fire caused urgent part requirements to stall at customs, EU Automation stepped in to resolve complex clearance issues and minimise downtime.
このフォームを送信すると同時に、EU Automationからのメール通信受信に同意されたものと見なされます。購読はいつでも解除可能です。を見る プライバシーポリシー
適切な部品選びに関するアドバイスやサポートが必要な場合でも、当社のチームがいつでもお手伝いし、お客様の業務が円滑に進むようサポートいたします。