Pulling together to restore production in Italy
Following severe flooding, coordinated sourcing and rapid delivery of multiple motors helped restore production for a long-established Italian manufacturer.
このページは現在、英語および一部の言語でのみご利用可能
When a cruise ship was stranded with thousands onboard, rapid global sourcing and air logistics helped minimise downtime and disruption.
Rapid global sourcing and overnight logistics coordination.
Minimised operational downtime, significantly reducing passenger disruption.
Strong customer appreciation and strengthened partnership.
On 9 December 2019, I received an urgent enquiry from one of Europe's premier ferry and cruise providers, a company that has been connecting the UK and Europe for nearly two centuries. They were facing a critical emergency when a cruise ship, the Ventura, was stranded off the coast of Tenerife due to multiple component failures. More than 3,100 passengers were aboard, creating an intense high-stakes scenario.
With the ship immobilised and docked in Tenerife, rapid procurement and delivery of specialised Siemens Simadyn components; processor modules, communication modules, interface modules and power supplies became critical. These parts needed to be sourced globally, delivered overnight to Germany and then flown directly to Tenerife via a chartered aircraft.
"When 3,100 people were left stranded, our logistical capabilities were put to the test."
Sven Bretschneider
Recognising the critical nature of the situation, our extensive global supply network sprang into action. Leaning heavily on our Order Fulfilment Team, we rapidly sourced all necessary components, meticulously coordinating the logistics to consolidate deliveries from multiple international suppliers. Through intensive overnight coordination, we secured early pick-ups for each part, ensuring their timely arrival in Hamburg. The comprehensive logistical planning culminated perfectly with the parts being promptly loaded onto the chartered plane.
Our swift, decisive actions resulted in the components arriving precisely when needed, significantly reducing the ship's downtime. The Ventura’s delay was minimised to only four days, avoiding prolonged inconvenience for thousands of passengers and ensuring minimal disruption. The swift success of the project generated a great amount of appreciation: "On behalf of the entire team, we would like to personally thank you for your outstanding efforts. We are delighted to have such flexible and committed suppliers on board."
納期が迫っている場合でも、当社のチームがお客様が必要とする部品の手配をサポートし、生産を円滑に進められるようお手伝いいたします。まずはお気軽にお問い合わせください。
Filippo Mavaro
Following severe flooding, coordinated sourcing and rapid delivery of multiple motors helped restore production for a long-established Italian manufacturer.
Rob Holloway
An unprecedented same-day international delivery prevented disruption for a leading aerospace manufacturer just days before Christmas.